Final Project Bobwhite-Manatee Transmission Line
Wow! I do not even know where to begin. This has by far been the most stressful and intensive school project I have ever had to complete. I have worked on this project from 7:00 pm to after 1:00am every weekday this week. Aside from sleep deprivation making this project challenging I also struggled greatly due to the lack of instruction. While I understand that aspect of the assignment these kinds of projects become very challenging for me because I over think the process and end up having a symptom some call "paralysis by analysis." Despite those struggles I pressed through and came out with a halfway decent result. I do wish I had more time on this project to clarify some things and make my data more readable, also due to time constraints there were several things I was no able to compete but for the time being I think my results will be acceptable.
I will give a brief overview of the final project. I only attached two of the maps I created because if I were to add them all this would be an obnoxiously long blog post. For the final project we did an analysis of the FPL Bobwhite-Manatee Transmission line. In this project we analyzed the corridor for the transmission line to see the effects it would have on the communities and the environment. This resulted in about 8 separate maps along with a large amount of accompanying data. Attached is the Arc GIS Story Map where all data can be viewed also attached is a link to the transcript.
https://arcg.is/1SynqT2
https://drive.google.com/file/d/1zfmPB2tU5tSZ6A95YyPiYZUmhBDka7xm/view?usp=drive_link.
Intro to GIS has been a very challenging but also rewarding experience, much of the material I learned I have already been able to utilize in my work. I look forward to continuing with this certification program.
Comments
Post a Comment